During the month of April 2021, the construction of the first stage of the local road and accesses project was completed, which includes a local road of more 1,000 lineal meters with its respective connections to Route 60 CH and incorporates a geometric design with ample width and space to permit normal and fluid transit of trucks and automobiles. It also includes a full-length sidewalk for pedestrian transit, a shoulder for vehicle parking and two one-way lanes that are 4 meters wide.